Something Else (2012)
In the autumn of 2012 I returned to x-church to make new work as part of Regrouping. The materials available in the church had changed drastically - it was far more inhabited now and there were far fewer chairs than there had been during Process(ion). Once again I was drawn to the altar and the space in front of it , but on this occasion I wanted to avoid the monumentality of my previous intervention here as I was more interested in a kind of 'sculptural conversation' with the spaces and features that make up this end of the building. The work came together quickly, over the space of a day, and also incorporated a substantially reworked smaller, older sculpture - Hook and Sinker (2011) X marks the spot. |